42-073-30650

SHUT IN

CARTER E HARRY LEE

CHEROKEE County · District 6 · PELES LLC · NECHES (WOODBINE)

RRC Lookup

Permits

1

Max Depth

5,260 ft

First Permit

1985-04-03

Latest Activity

1985-04-03

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2012-10-02

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: PELES LLC ≠ Permit: EXXON CORP.

Resolved via: productionPELES, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#271415 A EXXON CORP.
received 1985-04-03

Well Details

Well Number
9
Max Depth
5,260 ft
Drill Type
Vertical
County
CHEROKEE
District
6
Operator
PELES LLC
Completed
2012-10-02

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
607,555 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
13

External Links

Live © 2026 Petrora