42-073-30790

SHUT IN

CARTER E HARRY LEE

CHEROKEE County · District 6 · PELES LLC · NECHES (WOODBINE)

RRC Lookup

Permits

1

Max Depth

4,800 ft

First Permit

1991-05-23

Latest Activity

1991-05-23

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1991-08-14

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: PELES LLC ≠ Permit: EXXON CORP.

Resolved via: productionPELES, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#388266 A EXXON CORP.
received 1991-05-23

Well Details

Well Number
17
Max Depth
4,800 ft
Drill Type
Vertical
County
CHEROKEE
District
6
Operator
PELES LLC
Completed
1991-08-14

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
607,555 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
13

External Links

Live © 2026 Petrora