42-077-32423

Final Completion

WAGGONER A

CLAY County · District 9 · K-T PRODUCTION · BUFFALO SPRINGS E. (CADDO)

RRC Lookup

Permits

1

Max Depth

6,500 ft

First Permit

1981-10-28

Latest Activity

1981-10-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-03-16

Shut-In

Plugged

2023-12-06

!

EWA / Permit operator mismatch

Scheduling: K-T PRODUCTION ≠ Permit: TOLTEC OIL & GAS, INC.

Resolved via: schedulingK-T PRODUCTION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#138413 A TOLTEC OIL & GAS, INC.
received 1981-10-28

Well Details

Well Number
2
Max Depth
6,500 ft
Drill Type
Vertical
County
CLAY
District
9
Completed
1982-03-16

Operator

Location
BOYD
P-5 Status
Y (filed 2023-06-02)
Cum Oil (all leases)
704 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora