42-077-33307

PRODUCING

CHERRY MAUDE ELLEN

CLAY County · District 9 · CHASLA ENERGY LLC · CLAY COUNTY REGULAR

RRC Lookup

Permits

1

Max Depth

4,700 ft

First Permit

1983-12-30

Latest Activity

1983-12-30

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1984-05-04

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: CHASLA ENERGY LLC ≠ Permit: BISHOP & DOWDY OIL

Resolved via: schedulingCHASLA ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#225435 A BISHOP & DOWDY OIL
received 1983-12-30

Well Details

Well Number
4
Max Depth
4,700 ft
Drill Type
Vertical
County
CLAY
District
9
Completed
1984-05-04

Operator

Location
IOWA PARK
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
12,370 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
3

External Links

Live © 2026 Petrora