42-077-34256
Final CompletionTEXACO
CLAY County · District 9 · D/S OIL COMPANY · CLAY COUNTY REGULAR
Permits
1
Max Depth
1,850 ft
First Permit
1988-07-25
Latest Activity
1988-07-25
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1988-12-15
Shut-In
—
Plugged
2005-03-22
!
EWA / Production operator mismatch
Scheduling: D/S OIL COMPANY ≠ Production: JOINER, PAT (reported 1996-10)
!
EWA / Permit operator mismatch
Scheduling: D/S OIL COMPANY ≠ Permit: JOINER, PAT
Resolved via: scheduling → D/S OIL COMPANY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2008-03
Operator History
originally filed by JOINER, PAT — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#348972 A JOINER, PAT
received 1988-07-18
Well Details
- Well Number
- 1
- Max Depth
- 1,850 ft
- Drill Type
- Vertical
- County
- CLAY
- District
- 9
- Operator
- D/S OIL COMPANY
- Completed
- 1988-12-15
Operator
- Name
- D/S OIL COMPANY
- Location
- GAINESVILLE
- P-5 Status
- Y (filed 2007-11-03)
- Cum Oil (all leases)
- 8,756 bbl
- Cum Gas (all leases)
- — mcf