42-081-00311

Final Completion

BRUNSON

COKE County · District 7 · BOAZ ENERGY II OPERATING LLC · NDUGU (CROSS-CUT)

RRC Lookup

Permits

1

Max Depth

5,408 ft

First Permit

2012-03-22

Latest Activity

2012-03-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2012-07-20

Shut-In

Plugged

2017-02-09

!

EWA / Production operator mismatch

Scheduling: BOAZ ENERGY II OPERATING LLC ≠ Production: MEMORIAL PRODUCTION OPER. LLC (reported 2015-08)

!

EWA / Permit operator mismatch

Scheduling: BOAZ ENERGY II OPERATING LLC ≠ Permit: BOAZ ENERGY, LLC

Resolved via: schedulingBOAZ ENERGY II OPERATING LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2012-07

Last Production

2017-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#734591 A BOAZ ENERGY, LLC
received 2012-02-23

Well Details

Well Number
122L
Max Depth
5,408 ft
Drill Type
Vertical
County
COKE
District
7
Completed
2012-07-20

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
5,822,205 bbl
Cum Gas (all leases)
800,574 mcf
Activities
OPRS/O
Total Permits
146

External Links

Live © 2026 Petrora