42-081-31081

Final Completion

CARR ESTATE ET AL

COKE County · District 7 · EDWARDS ENERGY CORPORATION · JAMESON (STRAWN)

RRC Lookup

Permits

1

Max Depth

6,400 ft

First Permit

1981-12-22

Latest Activity

1981-12-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-02-14

Shut-In

Plugged

2003-11-17

!

EWA / Production operator mismatch

Scheduling: EDWARDS ENERGY CORPORATION ≠ Production: WARREN AMERICAN OIL COMPANY (reported 1998-09)

Resolved via: schedulingEDWARDS ENERGY CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#145372 A EDWARDS ENERGY CORPORATION
received 1981-12-22

Well Details

Well Number
1
Max Depth
6,400 ft
Drill Type
Vertical
County
COKE
District
7
Completed
1982-02-14

Operator

Location
MIDLAND
P-5 Status
Y (filed 2003-01-03)
Cum Oil (all leases)
19,984 bbl
Cum Gas (all leases)
— mcf
Total Permits
6

External Links

Live © 2026 Petrora