42-081-31634
Final Completion DirectionalHENDRY POINT UNIT
COKE County · District 7 · ALEGRE ENERGY INC. · FORT CHADBOURNE (GARDNER)
Permits
2
Max Depth
6,300 ft
First Permit
1994-06-13
Latest Activity
1996-10-10
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1996-09-25
Shut-In
—
Plugged
2001-11-09
!
EWA / Production operator mismatch
Scheduling: ALEGRE ENERGY INC. ≠ Production: RIM OPERATING, INC. (reported 2005-05)
!
EWA / Permit operator mismatch
Scheduling: ALEGRE ENERGY INC. ≠ Permit: RIM OPERATING, INC.
Resolved via: scheduling → ALEGRE ENERGY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1994-05
Last Production
2008-03
Operator History
originally filed by RIM OPERATING, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#453522 A RIM OPERATING, INC.
received 1996-10-07
#424580 A RIM OPERATING, INC.
received 1994-06-06
Well Details
- Well Number
- 2
- Max Depth
- 6,300 ft
- Drill Type
- Directional
- County
- COKE
- District
- 7
- Operator
- ALEGRE ENERGY INC.
- Completed
- 1996-09-25
Operator
- Name
- ALEGRE ENGY, INC
- Location
- SAN ANTONIO
- P-5 Status
- Y (filed 2017-06-02)
- Cum Oil (all leases)
- 1,102,795 bbl
- Cum Gas (all leases)
- 4,266,778 mcf
- Total Permits
- 5