42-081-31634

Final Completion Directional

HENDRY POINT UNIT

COKE County · District 7 · ALEGRE ENERGY INC. · FORT CHADBOURNE (GARDNER)

RRC Lookup

Permits

2

Max Depth

6,300 ft

First Permit

1994-06-13

Latest Activity

1996-10-10

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-09-25

Shut-In

Plugged

2001-11-09

!

EWA / Production operator mismatch

Scheduling: ALEGRE ENERGY INC. ≠ Production: RIM OPERATING, INC. (reported 2005-05)

!

EWA / Permit operator mismatch

Scheduling: ALEGRE ENERGY INC. ≠ Permit: RIM OPERATING, INC.

Resolved via: schedulingALEGRE ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-05

Last Production

2008-03

Operator History

originally filed by RIM OPERATING, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#453522 A RIM OPERATING, INC.
received 1996-10-07
#424580 A RIM OPERATING, INC.
received 1994-06-06

Well Details

Well Number
2
Max Depth
6,300 ft
Drill Type
Directional
County
COKE
District
7
Completed
1996-09-25

Operator

Location
SAN ANTONIO
P-5 Status
Y (filed 2017-06-02)
Cum Oil (all leases)
1,102,795 bbl
Cum Gas (all leases)
4,266,778 mcf
Total Permits
5

External Links

Live © 2026 Petrora