42-081-31681

SHUT IN Directional

HENDRY POINT UNIT

COKE County · District 7 · GOODROCK NATURAL RESOURCES LLC · FORT CHADBOURNE W. (ELLEN.)

RRC Lookup

Permits

5

Max Depth

6,500 ft

First Permit

1995-07-13

Latest Activity

2023-02-23

Lifespan

28 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2000-08-27

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Production operator mismatch

Scheduling: GOODROCK NATURAL RESOURCES LLC ≠ Production: PROLINE ENERGY RESOURCES INC (reported 2021-07)

Resolved via: schedulingGOODROCK NATURAL RESOURCES LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1995-08

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (5)

#888090 A GOODROCK NATURAL RESOURCES, LLC
received 2023-02-09
#612446 A ALEGRE ENERGY, INC.
received 2006-01-13
#492963 A RIM OPERATING, INC.
received 2000-09-15
#492963 A RIM OPERATING, INC.
received 2000-03-10
#437826 A RIM OPERATING, INC.
received 1995-07-13
Lat 32.053985
Lon -100.280670

Well Details

Well Number
3A
Max Depth
6,500 ft
Drill Type
Directional
County
COKE
District
7
Completed
2000-08-27

Operator

Location
TULSA
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
481,889 bbl
Cum Gas (all leases)
30,099 mcf
Activities
OPRS/G, OPRS/O
Total Permits
56

External Links

Live © 2026 Petrora