42-083-32246

MILLER D.

COLEMAN County · District 7 · WINDHAM RESOURCES · BALLARD (MORRIS SAND)

RRC Lookup

Permits

1

Max Depth

3,200 ft

First Permit

1980-09-16

Latest Activity

1980-09-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-12-01

Shut-In

Plugged

2009-10-19

!

EWA / Permit operator mismatch

Scheduling: WINDHAM RESOURCES ≠ Permit: ADLER PETROLEUM COMPANY

Resolved via: schedulingWINDHAM RESOURCES

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#92675 A ADLER PETROLEUM COMPANY
received 1980-09-16

Well Details

Well Number
1
Max Depth
3,200 ft
Drill Type
Vertical
County
COLEMAN
District
7
Completed
1980-12-01

Operator

Location
ABILENE
P-5 Status
Y (filed 2009-10-02)
Cum Oil (all leases)
11,689 bbl
Cum Gas (all leases)
65,097 mcf

External Links

Live © 2026 Petrora