42-083-33024
Final CompletionLOCKER O.C. BERTRAND
COLEMAN County · District 7 · COLEMAN COUNTY PROJECT · GLEN COVE S. (PALO PINTO)
Permits
1
Max Depth
6,000 ft
First Permit
1982-05-18
Latest Activity
1982-05-18
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-06-26
Shut-In
—
Plugged
1989-02-22
!
EWA / Permit operator mismatch
Scheduling: COLEMAN COUNTY PROJECT ≠ Permit: HARLOW, M.C.
Resolved via: scheduling → COLEMAN COUNTY PROJECT
Operator History
originally filed by HARLOW, M.C. — asset transferred
Permit History (1)
Permit Applications (1)
#160974 A HARLOW, M.C.
received 1982-05-18
Well Details
- Well Number
- 1
- Max Depth
- 6,000 ft
- Drill Type
- Vertical
- County
- COLEMAN
- District
- 7
- Operator
- COLEMAN COUNTY PROJECT
- Completed
- 1982-06-26
Operator
- Location
- COLEMAN
- P-5 Status
- Y (filed 2012-07-06)
- Cum Oil (all leases)
- 4,282 bbl
- Cum Gas (all leases)
- 49,697 mcf