42-083-33681

Final Completion

PARKER DAVID

COLEMAN County · District 7 · BILBO WIRELINE SERVICE INC. · HRUBETZ (ELLEN)

RRC Lookup

Permits

1

Max Depth

4,700 ft

First Permit

1983-08-26

Latest Activity

1983-08-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-09-26

Shut-In

Plugged

1996-02-27

!

EWA / Production operator mismatch

Scheduling: BILBO WIRELINE SERVICE INC. ≠ Production: WESTWOOD ENERGY, INC. (reported 1995-07)

!

EWA / Permit operator mismatch

Scheduling: BILBO WIRELINE SERVICE INC. ≠ Permit: WESTWOOD ENERGY, INC.

Resolved via: schedulingBILBO WIRELINE SERVICE INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1996-03

Operator History

originally filed by WESTWOOD ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#208043 A WESTWOOD ENERGY, INC.
received 1983-08-22

Well Details

Well Number
2A
Max Depth
4,700 ft
Drill Type
Vertical
County
COLEMAN
District
7
Completed
1983-09-26

Operator

Location
ABILENE
P-5 Status
Y (filed 2002-04-05)
Cum Oil (all leases)
4,323 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora