42-089-31365
Final CompletionMINARCIK MILTON
COLORADO County · District 3 · CLAY PETROLEUM INC. · ENGLEHART (6800)
Permits
3
Max Depth
6,878 ft
First Permit
1982-11-01
Latest Activity
1992-05-14
Lifespan
10 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1999-10-27
!
EWA / Production operator mismatch
Scheduling: CLAY PETROLEUM INC. ≠ Production: SANDEL ENERGY, INC. (reported 1999-05)
!
EWA / Permit operator mismatch
Scheduling: CLAY PETROLEUM INC. ≠ Permit: SANHALL CORPORATION
Resolved via: scheduling → CLAY PETROLEUM INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1999-10
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (3)
Permit Applications (3)
#398674 A SANHALL CORPORATION
received 1992-05-04
#261259 A CLAY PETROLEUM, INC.
received 1984-12-14
#182659 A CLAY, A. CARROLL
received 1983-07-25
Well Details
- Well Number
- 1
- Max Depth
- 6,878 ft
- Drill Type
- Vertical
- County
- COLORADO
- District
- 3
- Operator
- CLAY PETROLEUM INC.
Operator
- Name
- CLAY PETRO, INC
- Location
- TYLER
- P-5 Status
- Y (filed 1988-06-15)
- Total Permits
- 3