42-093-30550
STEWART BROS
COMANCHE County · District 7 · SMITH PIPE OF ABILENE · MITTIE (MARBLE FALLS)
Permits
1
Max Depth
3,000 ft
First Permit
1978-05-10
Latest Activity
1978-05-10
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1978-05-14
Shut-In
—
Plugged
2011-01-20
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: BURK ROYALTY COMPANY (reported 1996-06)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: CHALMERS, JOHN H.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2011-02
Operator History
originally filed by CHALMERS, JOHN H. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#23839 A CHALMERS, JOHN H.
received 1978-05-10
Well Details
- Well Number
- 1
- Max Depth
- 3,000 ft
- Drill Type
- Vertical
- County
- COMANCHE
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1978-05-14
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf