42-093-31080

Final Completion

JOINER

COMANCHE County · District 7 · SMITH PIPE OF ABILENE · MITTIE (MARBLE FALLS)

RRC Lookup

Permits

1

Max Depth

3,000 ft

First Permit

1983-01-14

Latest Activity

1983-01-14

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-02-15

Shut-In

Plugged

2007-06-19

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: WATSON OIL & GAS CO. (reported 2001-10)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: MCMILLAN OPERATING COMPANY

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2007-06

Operator History

originally filed by MCMILLAN OPERATING COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#183294 A MCMILLAN OPERATING COMPANY
received 1983-01-14

Well Details

Well Number
2
Max Depth
3,000 ft
Drill Type
Vertical
County
COMANCHE
District
7
Completed
1983-02-15

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora