42-093-31368

Final Completion

WHITE

COMANCHE County · District 7 · SMITH PIPE OF ABILENE · MITTIE (MARBLE FALLS)

RRC Lookup

Permits

3

Max Depth

3,180 ft

First Permit

1985-09-16

Latest Activity

1986-09-09

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-03-08

Shut-In

Plugged

2007-06-14

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: B & W EXPLORATION

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2007-06

Operator History

originally filed by B & W EXPLORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#285231 A B & W EXPLORATION
received 1986-09-15
#320317 X B & W EXPLORATION
received 1986-09-15
#320317 A B & W EXPLORATION
received 1986-09-09
#285231 A B & W EXPLORATION
received 1985-09-13

Well Details

Well Number
1
Max Depth
3,180 ft
Drill Type
Vertical
County
COMANCHE
District
7
Completed
1986-03-08

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora