42-095-31446

FAYE KONETA

CONCHO County · District 7 · BEE-JAY PETRO INC. · STANSBERRY (CANYON 2800)

RRC Lookup

Permits

5

Max Depth

4,500 ft

First Permit

1992-02-13

Latest Activity

1998-09-21

Lifespan

7 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1992-05-18

Shut-In

Plugged

2019-06-06

!

EWA / Production operator mismatch

Scheduling: BEE-JAY PETRO INC. ≠ Production: DAMRON ENERGY (reported 2004-09)

Resolved via: schedulingBEE-JAY PETRO INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2019-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (5)

#479560 A BEE-JAY PETRO, INC.
received 1998-11-09
#479560 A BEE-JAY PETRO, INC.
received 1998-09-18
#432363 A BEE-JAY PETRO, INC.
received 1995-01-30
#396431 A BEE-JAY ENERGY
received 1992-07-15
#396431 A BEE-JAY ENERGY
received 1992-02-11

Well Details

Well Number
1
Max Depth
4,500 ft
Drill Type
Vertical
County
CONCHO
District
7
Completed
1992-05-18

Operator

Location
LEVELLAND
P-5 Status
Y (filed 2024-09-06)
Cum Oil (all leases)
902,078 bbl
Cum Gas (all leases)
2,484,903 mcf
Total Permits
10

External Links

Live © 2026 Petrora