42-095-31622

LYNCH

CONCHO County · District 7 · SMITH PIPE OF ABILENE · SEDONA CAROL (CROSS CUT)

RRC Lookup

Permits

2

Max Depth

3,550 ft

First Permit

1994-08-22

Latest Activity

1994-08-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1994-10-25

Shut-In

Plugged

2008-06-19

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: SEDONA OIL & GAS CORP. (reported 1995-03)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SEDONA OIL & GAS CORP.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-10

Last Production

2008-06

Operator History

originally filed by SEDONA OIL & GAS CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#427117 A SEDONA OIL & GAS CORP.
received 1995-02-07
#427117 A SEDONA OIL & GAS CORP.
received 1994-08-18

Well Details

Well Number
1
Max Depth
3,550 ft
Drill Type
Vertical
County
CONCHO
District
7
Completed
1994-10-25

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora