42-095-31644

Final Completion

MOORE KAY

CONCHO County · District 7 · SMITH PIPE OF ABILENE · SEDONA HOLUM (U. HARKEY)

RRC Lookup

Permits

1

Max Depth

3,900 ft

First Permit

1995-05-30

Latest Activity

1995-05-30

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-10-06

Shut-In

Plugged

2008-06-24

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: SEDONA OIL & GAS CORP. (reported 1997-11)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SEDONA OIL & GAS CORP.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1995-10

Last Production

2008-06

Operator History

originally filed by SEDONA OIL & GAS CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#436275 A SEDONA OIL & GAS CORP.
received 1995-05-26

Well Details

Well Number
1
Max Depth
3,900 ft
Drill Type
Vertical
County
CONCHO
District
7
Completed
1995-10-06

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora