42-095-31667
Final CompletionMOORE KAY
CONCHO County · District 7 · SMITH PIPE OF ABILENE · WILDCAT
Permits
1
Max Depth
3,900 ft
First Permit
1995-11-14
Latest Activity
1995-11-14
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1995-12-28
Shut-In
—
Plugged
2008-06-26
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SEDONA OIL & GAS CORP.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1995-12
Last Production
2026-03
Operator History
originally filed by SEDONA OIL & GAS CORP. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#441876 A SEDONA OIL & GAS CORP.
received 1995-11-13
Well Details
- Well Number
- 2
- Max Depth
- 3,900 ft
- Drill Type
- Vertical
- County
- CONCHO
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1995-12-28
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf