42-095-31693

Final Completion

BUNGER

CONCHO County · District 7 · SMITH PIPE OF ABILENE · HALLORAN (CROSS CUT)

RRC Lookup

Permits

1

Max Depth

3,300 ft

First Permit

1996-04-23

Latest Activity

1996-04-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-07-12

Shut-In

Plugged

2003-01-06

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HOBBS ENERGY CORPORATION

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#447363 A HOBBS ENERGY CORPORATION
received 1996-04-23

Well Details

Well Number
3A
Max Depth
3,300 ft
Drill Type
Vertical
County
CONCHO
District
7
Completed
1996-07-12

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora