42-095-31710
Final CompletionKRUSE
CONCHO County · District 7 · SMITH PIPE OF ABILENE · HALLORAN (CROSS CUT)
Permits
1
Max Depth
3,950 ft
First Permit
1996-07-31
Latest Activity
1996-07-31
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1997-04-20
Shut-In
—
Plugged
2003-01-10
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: HOBBS ENERGY CORPORATION (reported 1997-03)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HOBBS ENERGY CORPORATION
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1996-11
Last Production
2026-03
Operator History
originally filed by HOBBS ENERGY CORPORATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#450722 A HOBBS ENERGY CORPORATION
received 1996-07-24
Well Details
- Well Number
- 1
- Max Depth
- 3,950 ft
- Drill Type
- Vertical
- County
- CONCHO
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1997-04-20
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf