42-095-31887

Unperfed Completion

KRUSE

CONCHO County · District 7 · SMITH PIPE OF ABILENE · WILDCAT

RRC Lookup

Permits

1

Max Depth

4,000 ft

First Permit

2000-01-20

Latest Activity

2000-01-20

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2000-02-14

Shut-In

Plugged

2003-01-14

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HOBBS ENERGY CORPORATION

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2000-03

Last Production

2003-08

Operator History

originally filed by HOBBS ENERGY CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#491276 A HOBBS ENERGY CORPORATION
received 2000-01-20

Well Details

Well Number
2
Max Depth
4,000 ft
Drill Type
Vertical
County
CONCHO
District
7
Completed
2000-02-14

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora