Permits
1
Max Depth
4,000 ft
First Permit
2000-01-20
Latest Activity
2000-01-20
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2000-02-14
Shut-In
—
Plugged
2003-01-14
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HOBBS ENERGY CORPORATION
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2000-03
Last Production
2003-08
Operator History
originally filed by HOBBS ENERGY CORPORATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#491276 A HOBBS ENERGY CORPORATION
received 2000-01-20
Well Details
- Well Number
- 2
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- CONCHO
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 2000-02-14
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf