42-095-32360

NO PRODUCTION

DIERSCHKE

CONCHO County · District 7 · CAZAR ENERGY INC · MILLERSVIEW W. (CAMAR SD.)

RRC Lookup

Permits

1

Max Depth

4,000 ft

First Permit

2011-05-02

Latest Activity

2011-05-02

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2011-08-02

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2004-09

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#715204 A CAZAR ENERGY INC
received 2011-04-28

Well Details

Well Number
3
Max Depth
4,000 ft
Drill Type
Vertical
County
CONCHO
District
7
Completed
2011-08-02

Operator

Location
AUSTIN
P-5 Status
Y (filed 2026-03-04)
Cum Oil (all leases)
170,600 bbl
Cum Gas (all leases)
112,487 mcf
Activities
OPRS/G, OPRS/O
Total Permits
16

External Links

Live © 2026 Petrora