42-097-33692

Final Completion

BEDROCK RANCH C

COOKE County · District 9 · SMITH PIPE OF ABILENE · NEWARK EAST (BARNETT SHALE)

RRC Lookup

Permits

1

Max Depth

9,000 ft

First Permit

2004-09-13

Latest Activity

2004-09-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2006-01-01

Shut-In

Plugged

2010-08-25

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: MERRITT OPERATING, INC. (reported 2006-03)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: MERRITT OPERATING, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2006-01

Last Production

2026-03

Operator History

originally filed by MERRITT OPERATING, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#550841 A MERRITT OPERATING, INC.
received 2004-09-10

Well Details

Well Number
4
Max Depth
9,000 ft
Drill Type
Vertical
County
COOKE
District
9
Completed
2006-01-01

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora