42-101-30206

TIPPEN

COTTLE County · District 8 · SMITH PIPE OF ABILENE · TIPPEN S.W. (CONGL. 6660)

RRC Lookup

Permits

1

Max Depth

7,500 ft

First Permit

1977-12-30

Latest Activity

1977-12-30

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1977-11-22

Shut-In

Plugged

1993-04-12

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: GRAHAM ENERGY DEVELOPMENT CORP.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by GRAHAM ENERGY DEVELOPMENT CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#11867 A GRAHAM ENERGY DEVELOPMENT CORP.
received 1977-12-30

Well Details

Well Number
1
Max Depth
7,500 ft
Drill Type
Vertical
County
COTTLE
District
8
Completed
1977-11-22

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora