42-103-34006
Final CompletionCRANE -B- FEE
CRANE County · District 8 · MARALO INC. · EDWARDS -04- (ELLENBURGER S.)
Permits
2
Max Depth
12,000 ft
First Permit
1990-01-15
Latest Activity
1994-05-04
Lifespan
4 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1990-04-10
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: MARALO INC. ≠ Production: V-F PETROLEUM INC. (reported 2025-12)
Resolved via: production → V-F PETROLEUM INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#423520 A MARALO, INC.
received 1994-05-03
#368563 A MARALO, INC.
received 1990-01-12
Well Details
- Well Number
- 5R
- Max Depth
- 12,000 ft
- Drill Type
- Vertical
- County
- CRANE
- District
- 8
- Operator
- MARALO INC.
- Completed
- 1990-04-10
Operator
- Name
- MARALO, INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 1999-04-05)
- Cum Oil (all leases)
- 4,571,562 bbl
- Cum Gas (all leases)
- 3,090,053 mcf
- Total Permits
- 412