42-105-36084

Final Completion

UNIVERSITY CN A

CROCKETT County · District 7 · RECOVERY OPERATING LP · FARMER (SAN ANDRES)

RRC Lookup

Permits

1

Max Depth

2,750 ft

First Permit

1992-06-04

Latest Activity

1992-06-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1992-08-01

Shut-In

Plugged

1993-12-02

!

EWA / Permit operator mismatch

Scheduling: RECOVERY OPERATING LP ≠ Permit: MCCABE ENERGY, INC.

Resolved via: productionRECOVERY OPERATING LP

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#399632 A MCCABE ENERGY, INC.
received 1992-05-26

Well Details

Well Number
4
Max Depth
2,750 ft
Drill Type
Vertical
County
CROCKETT
District
7
Completed
1992-08-01

Operator

Location
SAN ANGELO
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
104,227 bbl
Cum Gas (all leases)
849,123 mcf
Activities
OPRS/G, OPRS/O
Total Permits
2

External Links

Live © 2026 Petrora