42-107-30364
Final CompletionPALMER (WOODWARD)
CROSBY County · District 8 · CADDELL DELTON · RIDGE SOUTH (CLEAR FORK)
Permits
1
Max Depth
4,300 ft
First Permit
1979-05-29
Latest Activity
1979-05-29
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-07-07
Shut-In
—
Plugged
2000-09-07
!
EWA / Permit operator mismatch
Scheduling: CADDELL DELTON ≠ Permit: P C P OIL CO.
Resolved via: scheduling → CADDELL DELTON
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
originally filed by P C P OIL CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#49610 A P C P OIL CO.
received 1979-05-29
Well Details
- Well Number
- 1
- Max Depth
- 4,300 ft
- Drill Type
- Vertical
- County
- CROSBY
- District
- 8
- Operator
- CADDELL DELTON
- Completed
- 1979-07-07
Operator
- Name
- CADDELL, DELTON
- Location
- RALLS
- P-5 Status
- Y (filed 2000-05-05)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 14