ROADRUNNER 18 SWD
CULBERSON County · District 8 · CHEVRON U. S. A. INC. · FORD WEST (4100)
Permits
2
Max Depth
4,000 ft
First Permit
2015-12-08
Latest Activity
2018-12-31
Lifespan
3 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
2024-09-14
Shut-In
—
Plugged
—
P-5 Org Status: X
!
EWA / Permit operator mismatch
Scheduling: CHEVRON U. S. A. INC. ≠ Permit: RING ENERGY, INC.
Resolved via: scheduling → CHEVRON U. S. A. INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2019-01
Last Production
2026-03
Operator History
originally filed by RING ENERGY, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#844424 A RING ENERGY, INC.
received 2018-09-06
#812390 A RING ENERGY, INC.
received 2015-12-01
Lat 31.840456
Lon -104.097383
Well Details
- Well Number
- 4
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- CULBERSON
- District
- 8
- Operator
- CHEVRON U. S. A. INC.
- Completed
- 2024-09-14
Operator
- Name
- TEXACO E & P INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-11-04)
- Cum Oil (all leases)
- 622,347,311 bbl
- Cum Gas (all leases)
- 4,191,207,826 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
- Total Permits
- 9,225