42-115-31487

Final Completion

LOE

DAWSON County · District 8 · SMITH PIPE OF ABILENE · BRITT (SPRABERRY)

RRC Lookup

Permits

1

Max Depth

7,600 ft

First Permit

1981-03-03

Latest Activity

1981-03-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-09-15

Shut-In

Plugged

1994-04-12

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: RIATA ENERGY, INC. (reported 1993-11)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TRI-SERVICE DRILLING CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-06

Operator History

originally filed by TRI-SERVICE DRILLING CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#110370 A TRI-SERVICE DRILLING CO.
received 1981-03-03

Well Details

Well Number
2
Max Depth
7,600 ft
Drill Type
Vertical
County
DAWSON
District
8
Completed
1981-09-15

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora