42-115-32888
Final CompletionHOGAN
DAWSON County · District 8 · BRAHANEY DRILLING COMPANY LTD. · CEDAR LAKE
Permits
2
Max Depth
5,000 ft
First Permit
1996-03-14
Latest Activity
1996-03-14
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1996-04-29
Shut-In
—
Plugged
2014-05-23
EWA / Production operator mismatch
Scheduling: BRAHANEY DRILLING COMPANY LTD. ≠ Production: BRAHANEY DRILLING CO. (reported 2006-06)
EWA / Permit operator mismatch
Scheduling: BRAHANEY DRILLING COMPANY LTD. ≠ Permit: BRAHANEY DRILLING CO.
Resolved via: scheduling → BRAHANEY DRILLING COMPANY LTD.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1996-04
Last Production
2015-04
Operator History
originally filed by BRAHANEY DRILLING CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
Well Details
- Well Number
- 1
- Max Depth
- 5,000 ft
- Drill Type
- Vertical
- County
- DAWSON
- District
- 8
- Operator
- BRAHANEY DRILLING COMPANY LTD.
- Completed
- 1996-04-29
Operator
- Location
- MIDLAND
- P-5 Status
- Y (filed 2015-10-02)
- Cum Oil (all leases)
- 59,651 bbl
- Cum Gas (all leases)
- — mcf