42-121-30448

Final Completion

GREGORY

DENTON County · District 9 · CARIBBEAN ENERGY L.L.C. · NEILL (STRAWN)

RRC Lookup

Permits

3

Max Depth

1,900 ft

First Permit

1983-08-05

Latest Activity

2016-09-08

Lifespan

33 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-08-21

Shut-In

Plugged

2019-06-14

!

EWA / Production operator mismatch

Scheduling: CARIBBEAN ENERGY L.L.C. ≠ Production: TEXAS INDEPENDENT OIL CO., LLC (reported 2021-05)

Resolved via: schedulingCARIBBEAN ENERGY L.L.C.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#818074 A CARIBBEAN ENERGY, L.L.C.
received 2016-08-26
#363579 A NEILL, JAMES P. JR.
received 1989-09-05
#205470 A MCCUTCHIN, CODY
received 1983-08-05

Well Details

Well Number
3
Max Depth
1,900 ft
Drill Type
Vertical
County
DENTON
District
9
Completed
1988-08-21

Operator

Location
COTULLA
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
21,092 bbl
Cum Gas (all leases)
232,666 mcf
Total Permits
3

External Links

Live © 2026 Petrora