42-125-30453
Final CompletionWATSON
DICKENS County · District 8 · SMITH PIPE OF ABILENE · DOCKUM CREEK (TANNEHILL)
Permits
2
Max Depth
5,500 ft
First Permit
1991-06-28
Latest Activity
1991-06-28
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1991-08-24
Shut-In
—
Plugged
1998-04-27
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: H-M RESOURCE MANAGEMENT, INC. (reported 1994-04)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: WES-TEX DRLG. CO.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1998-06
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#389441 A WES-TEX DRLG. CO.
received 1991-09-27
#389441 A WES-TEX DRLG. CO.
received 1991-06-28
Well Details
- Well Number
- 1
- Max Depth
- 5,500 ft
- Drill Type
- Vertical
- County
- DICKENS
- District
- 8
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1991-08-24
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf