42-127-32713

PRODUCING

TUMLINSON

DIMMIT County · District 1 · MCDAY ENERGY CORP. · BLAKEWAY (OLMOS A)

RRC Lookup

Permits

1

Max Depth

4,900 ft

First Permit

1985-10-01

Latest Activity

1985-10-01

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1986-01-15

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: MCDAY ENERGY CORP. ≠ Permit: CABOT PETROLEUM CORPORATION

Resolved via: productionMCDAY ENERGY CORP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#286634 A CABOT PETROLEUM CORPORATION
received 1985-10-01

Well Details

Well Number
14
Max Depth
4,900 ft
Drill Type
Vertical
County
DIMMIT
District
1
Completed
1986-01-15

Operator

Location
DALLAS
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
1,563,136 bbl
Cum Gas (all leases)
1,471,889 mcf
Activities
OPRS/G, OPRS/O
Total Permits
52

External Links

Live © 2026 Petrora