42-131-09498

U

PARR ATLEE -A-

DUVAL County · District 4 · MAGNUM ENGINEERING COMPANY · ORCONES (HOCKLEY-PARR)

RRC Lookup

Permits

1

Max Depth

7,575 ft

First Permit

1986-09-24

Latest Activity

1986-09-24

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-12-02

Shut-In

Plugged

1994-11-03

!

EWA / Permit operator mismatch

Scheduling: MAGNUM ENGINEERING COMPANY ≠ Permit: MOBIL PRODUCING TX. & N.M. INC.

Resolved via: schedulingMAGNUM ENGINEERING COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-11

Operator History

originally filed by MOBIL PRODUCING TX. & N.M. INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#320894 A MOBIL PRODUCING TX. & N.M. INC.
received 1986-09-22

Well Details

Well Number
4
Max Depth
7,575 ft
Drill Type
Vertical
County
DUVAL
District
4
Completed
1986-12-02

Operator

Location
CORPUS CHRS, TI
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
711,895 bbl
Cum Gas (all leases)
3,661,122 mcf
Activities
CSGD/P, G/PUR, OPRS/G, OPRS/O
Total Permits
13

External Links

Live © 2026 Petrora