42-131-33007

Final Completion

WEIL -B- SURVEY 131

DUVAL County · District 4 · VILLALON J. ANTONIO TRUSTEE · SARNOSA WEST

RRC Lookup

Permits

1

Max Depth

2,550 ft

First Permit

1979-01-23

Latest Activity

1979-01-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-03-15

Shut-In

Plugged

1997-06-13

!

EWA / Permit operator mismatch

Scheduling: VILLALON J. ANTONIO TRUSTEE ≠ Permit: MOBIL OIL CORPORATION

Resolved via: schedulingVILLALON J. ANTONIO TRUSTEE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by MOBIL OIL CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#41337 A MOBIL OIL CORPORATION
received 1979-01-23

Well Details

Well Number
3
Max Depth
2,550 ft
Drill Type
Vertical
County
DUVAL
District
4
Completed
1979-03-15

Operator

Location
MCALLEN
P-5 Status
Y (filed 2007-06-08)
Cum Oil (all leases)
619 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora