42-131-36253

Final Completion

SCHAWE L.P. ET AL

DUVAL County · District 4 · HOWARD EXPLORATION INC. · KREIS

RRC Lookup

Permits

1

Max Depth

3,500 ft

First Permit

1983-05-18

Latest Activity

1983-05-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-06-10

Shut-In

Plugged

1998-06-16

!

EWA / Permit operator mismatch

Scheduling: HOWARD EXPLORATION INC. ≠ Permit: HOWARD, DOUGLAS J.

Resolved via: schedulingHOWARD EXPLORATION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by HOWARD, DOUGLAS J. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#195750 A HOWARD, DOUGLAS J.
received 1983-05-18

Well Details

Well Number
1
Max Depth
3,500 ft
Drill Type
Vertical
County
DUVAL
District
4
Completed
1983-06-10

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
698,763 bbl
Cum Gas (all leases)
3,654,219 mcf
Total Permits
113

External Links

Live © 2026 Petrora