42-131-36843

Final Completion

DAVY C. R.

DUVAL County · District 4 · RISA ENERGY CORPORATION · FITZSIMMONS EAST (Y-2)

RRC Lookup

Permits

3

Max Depth

6,000 ft

First Permit

1985-11-22

Latest Activity

1989-07-20

Lifespan

4 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-01-18

Shut-In

Plugged

2004-12-13

!

EWA / Production operator mismatch

Scheduling: RISA ENERGY CORPORATION ≠ Production: DUSTER PRODUCTION, INC. (reported 1995-11)

!

EWA / Permit operator mismatch

Scheduling: RISA ENERGY CORPORATION ≠ Permit: HADA, J. L., JR.

Resolved via: schedulingRISA ENERGY CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2004-12

Operator History

originally filed by HADA, J. L., JR. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#361599 A HADA, J. L., JR.
received 1989-07-17
#325060 A RISA ENERGY CORPORATION
received 1987-01-05
#290841 A RISA ENERGY CORPORATION
received 1985-11-22

Well Details

Well Number
2A
Max Depth
6,000 ft
Drill Type
Vertical
County
DUVAL
District
4
Completed
1986-01-18

Operator

Location
CORPUS CHRS, TI
P-5 Status
Y (filed 1995-07-07)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Total Permits
28

External Links

Live © 2026 Petrora