42-131-37965

Final Completion

TYREE J. O.

DUVAL County · District 4 · HMT PIPELINE COMPANY INC. · LABBE (2650)

RRC Lookup

Permits

1

Max Depth

3,200 ft

First Permit

1994-08-16

Latest Activity

1994-08-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1994-09-07

Shut-In

Plugged

2008-01-14

!

EWA / Permit operator mismatch

Scheduling: HMT PIPELINE COMPANY INC. ≠ Permit: UVALDE ENERGY CO.

Resolved via: schedulingHMT PIPELINE COMPANY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-09

Last Production

2008-01

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#427050 A UVALDE ENERGY CO.
received 1994-08-16

Well Details

Well Number
1A
Max Depth
3,200 ft
Drill Type
Vertical
County
DUVAL
District
4
Completed
1994-09-07

Operator

Location
SAN ANGELO
P-5 Status
Y (filed 2007-07-06)
Cum Oil (all leases)
490 bbl
Cum Gas (all leases)
51,077 mcf

External Links

Live © 2026 Petrora