42-131-38232

Final Completion

LOPEZ -A-

DUVAL County · District 4 · TRIUM LTD. · ORLEE

RRC Lookup

Permits

1

Max Depth

1,850 ft

First Permit

1998-02-12

Latest Activity

1998-02-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1998-03-27

Shut-In

Plugged

2024-08-28

!

EWA / Permit operator mismatch

Scheduling: TRIUM LTD. ≠ Permit: TRIUM ENERGY, INC.

Resolved via: productionTRIUM, LTD.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#473175 A TRIUM ENERGY, INC.
received 1998-02-09

Well Details

Well Number
24B
Max Depth
1,850 ft
Drill Type
Vertical
County
DUVAL
District
4
Operator
TRIUM LTD.
Completed
1998-03-27

Operator

Location
LAREDO
P-5 Status
Y (filed 2026-01-05)
Cum Oil (all leases)
119,838 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G, OPRS/O
Total Permits
3

External Links

Live © 2026 Petrora