42-131-38488

PRODUCING

IBARRA ANTONIO ET AL

DUVAL County · District 4 · FAULCONER ENERGY LLC · AGUA PRIETA (QUEEN CITY)

RRC Lookup

Permits

3

Max Depth

9,020 ft

First Permit

2001-01-19

Latest Activity

2001-08-16

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2001-03-28

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: EDGE PETROLEUM OPER. CO., INC.

Resolved via: productionFAULCONER ENERGY, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2001-03

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#512565 A EDGE PETROLEUM OPER. CO., INC.
received 2001-08-14
#504272 A EDGE PETROLEUM OPER. CO., INC.
received 2001-04-24
#504272 A EDGE PETROLEUM OPER. CO., INC.
received 2001-01-19

Well Details

Well Number
1
Max Depth
9,020 ft
Drill Type
Vertical
County
DUVAL
District
4
Completed
2001-03-28

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora