42-131-38502

TEMP ABANDONED DirectionalSidetrack

LA JOLLA-PARR

DUVAL County · District 4 · FAULCONER ENERGY LLC · AGUA PRIETA (QUEEN CITY)

RRC Lookup

Permits

2

Max Depth

9,000 ft

First Permit

2001-04-12

Latest Activity

2001-04-12

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2001-07-13

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: EDGE PETROLEUM OPER. CO., INC.

Resolved via: schedulingFAULCONER ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2001-07

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#507705 A EDGE PETROLEUM OPER. CO., INC.
received 2001-08-28
#507705 A EDGE PETROLEUM OPER. CO., INC.
received 2001-04-12

Well Details

Well Number
1ST
Max Depth
9,000 ft
Drill Type
Directional, Sidetrack
County
DUVAL
District
4
Completed
2001-07-13

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora