42-131-38776

PRODUCING

PARR KIBBE MOLINA

DUVAL County · District 4 · WELDERXP LTD. · PARR SUNRAY (YEGUA CONSOLIDATED)

RRC Lookup

Permits

1

Max Depth

8,000 ft

First Permit

2005-01-28

Latest Activity

2005-01-28

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2005-03-24

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: WELDERXP LTD. ≠ Production: WELDER EXPLORATION & PROD., INC. (reported 2020-10)

!

EWA / Permit operator mismatch

Scheduling: WELDERXP LTD. ≠ Permit: NOBLE ENERGY INC

Resolved via: schedulingWELDERXP LTD.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2005-03

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#556950 A NOBLE ENERGY INC
received 2005-01-28

Well Details

Well Number
1
Max Depth
8,000 ft
Drill Type
Vertical
County
DUVAL
District
4
Operator
WELDERXP LTD.
Completed
2005-03-24

Operator

Location
SAN ANTONIO
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
78,417 bbl
Cum Gas (all leases)
1,009,981 mcf
Activities
OPRS/G, OPRS/O
Total Permits
14

External Links

Live © 2026 Petrora