42-131-39167
PRODUCINGCREWS
DUVAL County · District 4 · EL MESTENO ENERGY LLC · REYES NORTH (PETTUS)
Permits
2
Max Depth
4,600 ft
First Permit
2009-06-17
Latest Activity
2010-03-25
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2009-11-13
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Permit operator mismatch
Scheduling: EL MESTENO ENERGY LLC ≠ Permit: AMERICAN SHORELINE, INC.
Resolved via: production → EL MESTENO ENERGY LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2009-11
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#692530 A AMERICAN SHORELINE, INC.
received 2010-03-08
#681885 A AMERICAN SHORELINE, INC.
received 2009-06-05
Well Details
- Well Number
- 1
- Max Depth
- 4,600 ft
- Drill Type
- Vertical
- County
- DUVAL
- District
- 4
- Operator
- EL MESTENO ENERGY LLC
- Completed
- 2009-11-13
Operator
- Location
- THREE RIVER
- P-5 Status
- Y (filed 2025-07-23)
- Cum Oil (all leases)
- 2,450 bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O