42-131-39236

PRODUCING

CREWS

DUVAL County · District 4 · EL MESTENO ENERGY LLC · REYES NORTH (PETTUS)

RRC Lookup

Permits

2

Max Depth

4,300 ft

First Permit

2011-04-01

Latest Activity

2013-04-05

Lifespan

2 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2012-02-10

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: EL MESTENO ENERGY LLC ≠ Permit: AMERICAN SHORELINE, INC.

Resolved via: productionEL MESTENO ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2010-06

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#757595 A AMERICAN SHORELINE, INC.
received 2013-02-27
#712885 A AMERICAN SHORELINE, INC.
received 2011-03-25

Well Details

Well Number
5
Max Depth
4,300 ft
Drill Type
Vertical
County
DUVAL
District
4
Completed
2012-02-10

Operator

Location
THREE RIVER
P-5 Status
Y (filed 2025-07-23)
Cum Oil (all leases)
2,450 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O

External Links

Live © 2026 Petrora