42-131-39572
Unperfed CompletionWALLY
DUVAL County · District 4 · FORT APACHE ENERGY INC. · WILDCAT
Permits
1
Max Depth
7,000 ft
First Permit
2015-12-08
Latest Activity
2015-12-08
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2016-08-12
Shut-In
—
Plugged
2017-05-22
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2016-08
Last Production
2018-01
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#811243 A FORT APACHE ENERGY, INC.
received 2015-10-15
Well Details
- Well Number
- 1
- Max Depth
- 7,000 ft
- Drill Type
- Vertical
- County
- DUVAL
- District
- 4
- Operator
- FORT APACHE ENERGY INC.
- Completed
- 2016-08-12
Operator
- Location
- BOERNE
- P-5 Status
- Y (filed 2026-02-04)
- Cum Oil (all leases)
- 2,577,062 bbl
- Cum Gas (all leases)
- 3,710,932 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 84