42-131-39650

INJECTION

CREWS

DUVAL County · District 4 · EL MESTENO ENERGY LLC · N.REYES (HOCKLEY)

RRC Lookup

Permits

1

Max Depth

3,800 ft

First Permit

2021-05-17

Latest Activity

2021-05-17

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2024-11-23

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: EL MESTENO ENERGY LLC ≠ Production: FIRST ROCK, INC. (reported 2024-02)

!

EWA / Permit operator mismatch

Scheduling: EL MESTENO ENERGY LLC ≠ Permit: FIRST ROCK, INC.

Resolved via: schedulingEL MESTENO ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2021-10

Last Production

2026-03

Operator History

originally filed by FIRST ROCK, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#869700 A FIRST ROCK, INC.
received 2021-05-06
Lat 27.849015
Lon -98.413559

Well Details

Well Number
1S
Max Depth
3,800 ft
Drill Type
Vertical
County
DUVAL
District
4
Completed
2024-11-23

Operator

Location
THREE RIVER
P-5 Status
Y (filed 2025-07-23)
Cum Oil (all leases)
2,450 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O

External Links

Live © 2026 Petrora