42-133-31155
Final CompletionMOORE BOBBY
EASTLAND County · District 7 · ENRE CORP. · TEE JAY (3750)
Permits
2
Max Depth
4,040 ft
First Permit
1977-08-30
Latest Activity
1983-12-07
Lifespan
6 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1977-12-20
Shut-In
—
Plugged
1993-03-31
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1993-09
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#222749 A ENRE CORP.
received 1983-12-02
#6555 A WEST ARTESIA TRANSMISSION CO.
received 1977-08-30
Well Details
- Well Number
- 3
- Max Depth
- 4,040 ft
- Drill Type
- Vertical
- County
- EASTLAND
- District
- 7
- Operator
- ENRE CORP.
- Completed
- 1977-12-20
Operator
- Name
- ENRE CORP
- Location
- SAN ANTONIO
- P-5 Status
- Y (filed 2001-01-30)
- Cum Oil (all leases)
- 116,513 bbl
- Cum Gas (all leases)
- 11,883,194 mcf
- Total Permits
- 429