Permits
1
Max Depth
3,150 ft
First Permit
1978-03-15
Latest Activity
1978-03-15
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1990-03-17
Shut-In
—
Plugged
2014-09-11
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: NORTH RIDGE CORPORATION (reported 2010-04)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: BELLER PRODUCTION, INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2014-09
Operator History
originally filed by BELLER PRODUCTION, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#20102 A BELLER PRODUCTION, INC.
received 1978-03-15
Well Details
- Well Number
- 3
- Max Depth
- 3,150 ft
- Drill Type
- Vertical
- County
- EASTLAND
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1990-03-17
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf